Skip to content

Impact

Impact you can check.

A source and a date sit under every number on this page. Where a figure is ours, it comes from our own products. Where it is the industry’s, we name who measured it.

In developmentEvery KUZUB product is in active development, fully or partially. Some of what we describe is not yet available to every user.

  1. 01Carbon
  2. 02Productivity
  3. 03Open standards and access
  4. 04Scotland and Ukraine

01 · Carbon

Carbon, counted like money, while the design is drawn.

In Caldaia Studio, element by element, from official UK and EU data. Reported by the modules of EN 15978, with a range and a coverage beside the total; what is missing is named, never folded into a clean headline.

2028
EU life-cycle carbon reporting becomes mandatory for large new buildings.
2045
Scotland’s legal target for net zero.

EU EPBD 2024 · Climate Change (Emissions Reduction Targets) (Scotland) Act 2019

Demo calculation · in testing

The same 180 m² house, over 50 years

whole life · t CO₂e

New gas boiler, reference204 t
Air-source heat pump, calculated48 t (39-61)
86%coverage of the heat pump result. The generator is declared as an average air-source heat pump, not modelled.
Caldaia Studio carbon calculation, demo house, whole life 50 years, September 2026. The heat pump is calculated for this house: 48.4 t, range 39-61 t. The gas boiler is the reference the carbon report shows on its scale. Data: DESNZ, Ember, ÖKOBAUDAT.

02 · Productivity

Engineering time, back to engineering.

Heat loss, hydraulics, heat pumps and hot water, sized in one project from real products with their technical data and prices. The engineer’s judgement goes to the design, not to copying numbers from one tool into another.

47countrieswhere Caldaia Studio is available
35languagesin which Caldaia Studio works
9,000+catalogue itemsreal products with their technical data
50+brandsmanufacturers in the catalogue

Caldaia Studio, October 2026.

03 · Open standards

Knowledge that belongs to the industry.

OWL is an open library of construction work: what a task is, what it needs, how long it takes and under which norm. It feeds Caldaia Studio, YUBIM and KUZUB OS.

OWL

Access

In the language of the people who use it.

Caldaia Studio is available in 47 countries and works in 35 languages, so each firm works in its own language, wherever the project is.

04 · Scotland and Ukraine

Where we build, and who we build for.

We are a Scottish company, headquartered in Glasgow, with roots in Ukraine, a country that will rebuild at a scale few have seen. The first partner factory for MALVA, OLE-PRO, is in Kharkiv.

About the company
24 / 355

Young EDGE finalists in Scottish EDGE, from 355 applications across the round. The final is on 28 October 2026.

Scottish EDGE, 23 September 2026
$524bn

estimated cost of Ukraine’s recovery and reconstruction over the next decade.

RDNA4, 2025
39%

of global energy-related carbon emissions come from buildings.

World Green Building Council, 2019
Contact

Tell us about your work.